High-Profile: April 2026 | Page 8

8 High-Profile: Up-Front April 2026

Kaplan Begins Phases 3 and 4 at Sportsmen’ s Tennis & Enrichment Center

55

Years.
Bud Collins Welcome Center / Renderings courtesy of Utile
Boston – Kaplan Construction announced the start of Phases 3 and 4 at Sportsmen’ s Tennis & Enrichment Center in Dorchester. Building on the completion of the first two phases in 2024, Kaplan will deliver additional renovations and an 8,300sf addition to expand programming and enhance the overall campus experience.
“ After successfully completing the first two phases of Sportsmen’ s capital improvements plan, we’ re thrilled to continue our partnership,” said Nathan Peck, president of Kaplan Construction.“ These next and final phases further integrate
Integrated Land Development Solutions
CIVIL ENGINEERING | LAND SURVEY | LANDSCAPE ARCHITECTURE

Built on Experience. Trusted for Generations.

From Due Diligence to Delivery: Conceptual & Master Planning Site Design & Environmental Permitting Stormwater Management Boundary, Topo, ALTA / NSPS, As-Builts, and more Luxury Amenities, Open Space Planning, Streetscape Construction Support
athletics, education, and community by creating welcoming, functional spaces that advance Sportsmen’ s mission.”
Phase 3 introduces a new singlestory steel and light-gauge metal-framed connector building constructed within the existing open-air breezeways between Sportsmen’ s three court buildings. The addition will physically unify the campus while creating new locker rooms, a gym, and social gathering space for members and youth program participants. Additionally, the space will feature a permanent Breaking the Barriers exhibit celebrating the history of Black tennis in
📍📍 Woburn, MA 📍📍 Lakeville, MA 📍📍 Manchester, NH � www. allenmajor. com ✉ info @ allenmajor. com � [ 781 ] 935-6889
America and the athletes who challenged exclusion, along with another exhibit highlighting Billie Jean King’ s fight for equal pay for women. This phase also includes two new outdoor tennis courts and additional outdoor recreation space at the rear of the property, expanding opportunities for summer camp and other programming.
Phase 4 focuses on the renovation and strategic expansion of existing first-floor spaces. The lobby will be relocated as a ground-level welcome center, allowing the current lobby space to be transformed into a new welcome center, while former office areas will be converted into a teaching kitchen, multi-purpose community space, and a viewing gallery. The work also includes a new pro shop and additional office space for staff, designed to improve daily operations and support long-term growth. Careful coordination will allow the facility to remain active throughout construction, maintaining access for staff, tennis players, and youth learning center participants.
“ Sportsmen’ s has transformed dramatically in recent years, and this phase represents our most meaningful investment yet,” said Toni Wiley, CEO of Sportsmen’ s Tennis & Enrichment Center.“ Kaplan’ s familiarity with our campus brings invaluable continuity to
Rendering of front entry
this work. Their team understands how to operate within a highly active facility while prioritizing safety and keeping our mission at the center of every decision.”
In 2024, Kaplan Construction completed the first two phases of Sportsmen’ s campus transformation, including the construction of a new 24,000sf prefabricated building housing four indoor tennis courts and a connector linking the new and existing facilities. The work also included a 6,500sf renovation of the enrichment program areas, reconfigured restrooms, and upgraded building systems. All work was completed within an active, occupied facility.
With support from a wide community of donors and partners, Sportsmen’ s secured $ 17.7 million of the $ 20 million required to complete the expansion. New Balance Foundation is among the major supporters helping to make this next phase possible.
The project team members for Phases 3 and 4 also include New Atlantic Development, owner’ s representative; Utile, architect; RSE Associates, structural engineer; BLW Engineers, MEP / FP engineer; Samiotes Consultants, civil engineer; McPhail Associates, geotechnical engineer; and G2 Collaborative, landscape architect.
Representing
some of the region’ s finest merit shop contractors.
• ABC contractors deliver quality and value.
• ABC members have completed commercial construction projects of all types and sizes to the total satisfaction of their clients.
• Merit shop approach focuses on efficiency and results.
• Through ABC’ s STEP Safety Management System and the Gould Construction Institute, ABC’ s training affiliate, ABC helps its members achieve top-notch results, delivered safely.
100 Unicorn Park Drive, Suite 1, Woburn, MA 01801 781-273-0123 • www. abcma. org www. high-profile. com