Ask The Electrician:
July 2026 High-Profile Focus: Life Science Facilities 15
Ask The Electrician:
How Can Prefabrication Solve Construction Challenges in Life Sciences?
By Edward Gould
Life sciences facilities rely on complex electrical systems that must meet strict compliance standards. There is no room for error; yet today’ s project timelines are tighter than ever.
Construction projects in this sector – like research labs, cleanrooms, and pharmaceutical manufacturing facilities – require a blend of precision, speed, and safety. Electrical contractors are tasked with meeting accelerated project schedules without sacrificing the precision and cleanliness these facilities demand.
To meet increasingly tight deadlines, the industry is seeing a fundamental shift toward UL-certified prefabrication. By moving labor from the active jobsite into a controlled, offsite manufacturing environment, electrical contractors can deliver installation accuracy and significantly accelerated schedules.
Parallel Processing for Peak Efficiency
The driving force behind this streamlined approach is the prefabrication center, where coordinated data is converted into high-quality, pre-assembled components. Because fabrication happens offsite in tandem with ongoing site preparation, it creates a parallel process further supporting project constraints and tight schedules.
Some of the biggest prefab timesavers we see in life sciences construction include ceiling utility panels( CUPs), surface mounted raceways, and specialized lighting controls. Building a CUP from raw bulk materials while standing on a ladder can take a field crew hours. Prefabricated CUPs arrive on-site complete with predetermined devices, circuitry, and labeling, pre-wired for easy field hookup.
Building and wiring surface mounted raceway runs on-site can typically take an installer days. When prefabricated to exact predetermined lengths offsite, that field installation is greatly reduced.
When it comes to special lighting controls, systems for vivariums require complex bus networks to simulate day / night cycles and integrate specialized redlight options for after-hours operation. Prefabricating these systems minimizes
State-of-the-art electrical infrastructure supporting the demands of the life sciences sector. By prefabricating complex components like surface-mounted raceways offsite, field installation time is reduced from 3 – 4 days to just 30 – 60 minutes.
challenging, time-consuming ladder work in the field.
Elevating Jobsite Safety and Cleanliness
Beyond speed, offsite prefabrication directly improves the jobsite environment. Pharmaceutical and research facilities require exceptionally clean, organized construction spaces.
By staging and assembling materials offsite, the need to store raw bulk
components on-site is eliminated. This reduces jobsite congestion, waste, and safety hazards. Combined with a sophisticated offsite waste management process, prefabrication allows electrical contractors to maintain the pristine, safe environments that next-generation life sciences facilities demand.
Edward Gould is the Operations Center Production Area manager at Interstate Electrical Services Corporation.
Our
Independence, Your Advantage.
80 years of success for our firm and our clients in the AEC industry is proof that a combination of experienced guidance, staff continuity, and real-time decision making is the surest path to sustainable growth. To gain this independent advantage for your architectural, engineering, or construction company, call Marty Prendergast today at 781.407.0300.
Design
that listens. Spaces that inspire.
Marty Prendergast, MBA mprendergast @ gggllp. com
Enterprise Software for AEC
CONSULTING • TAX • AUDIT & ASSURANCE PRIVATE WEALTH • INVESTMENT BANKING www. gggllp. com 781.407.0300
SCAN FOR MORE
* Private wealth services provided by Gray Private Wealth, LLC. Securities Products and Investment Banking Services are offered through BA Securities, LLC. Member FINRA SIPC. Gray Strategic Partners, LLC and BA Securities, LLC are separate, unaffiliated entities.
®
ABOUT MP:
We are an architecture and design firm with a diverse team that collaborates across various sectors, including workplace, science & technology, healthcare, new buildings & renovations, and mixed-use developments. We believe that design has the power to transform the work experience, increase productivity, and inspire.
308 Congress Street, Boston, MA 02210 | 617.482.3232 www. high-profile. com