High-Profile: March 2026 | Page 23

March 2026 High-Profile Focus: Schools and Institutions 23
Second floor HR suite Event space
installation of a full-building sprinkler system; and energy-efficient upgrades throughout. Each floor now features a mix of open office workspaces, private offices, and conference areas designed to support collaboration and day-to-day operations.
Additional improvements included a new entry canopy, lobby and ADAcompliant ramp facing the Falls Music Center. The project also replaced the building’ s existing windows with historically matched replicas, maintaining
the exterior’ s original appearance while improving thermal performance space for current and future students.
The project was accomplished through a collaboration with Annum Architects, AHA Consulting Engineers,
Samiotes Consultants, LeMessurier, WSP, Sladen Feinstein, Stimson, Phoenix Mechanical Contracting Inc., North Shore Mechanical Contractors, Nappa Electrical Contractors, and A & E Fire Protection Inc.
www. high-profile. com